OPS 01
Turnaround Time
Every truck. Every stage. Every second it took.
LPR and vehicle embeddings captured at gate and dock cameras. Stitched into stage-level dwell times, bay utilization, and cycle metrics.
Five stages tracked: Gate-In (LPR capture) → Yard Dwell (vehicle tracking) → Dock-In (door assignment) → Dock-Out (load complete) → Gate-Out (LPR exit match, total turnaround logged).
LPR
Multi-region. >99% read rate.
Vehicle embeddings
Cross-camera re-ID. Occlusion tolerant.